Asked 2026-05-02 · Answered 2026-05-27
Did the Mansfield ISD bond propositions pass on May 2?
Yes — both. Proposition A (Equip & Renovate Facilities): 5,828 for (54.37%) vs 4,891 against (45.62%). Proposition B (Instructional Technology): 5,654 for (52.91%) vs 5,032 against (47.08%). The ballot also included two Board of Trustees seats (Place 6, Place 7). Source: The Texan.
Got a follow-up question or a correction? Tell the desk.